The median Berkeley house went up in 1941 and the median Dublin house in 2007. Sixty-six years apart, inside one service area. One sits inside the sampling window and the other sits outside it, and that decides what happens on day one.
Somebody answers and a van leaves. Looking is on us. CSLB #1131134 · IICRC #70194273
Two federal lines, and a house is on one side or the other.
Lead paint in homes stopped being legal in 1978. Asbestos left building materials gradually across the decade after.
A house finished before those dates is presumed to hold both until somebody proves otherwise.
Proving otherwise means a sample and a laboratory, not an opinion in a hallway.
The median one does, and most of its neighbors too.
Berkeley‘s median house predates both lines by decades.
Oakland’s median is 1952, which is the same answer with a different number.
Opening a wall there without a result first is the exception, not the routine.
The median house there is newer than both rules.
Dublin‘s median year is 2007, sixty-six years after Berkeley’s.
Same company, same crew, same week, and a completely different first morning.
That is the widest housing-age spread of the four SOS service areas.
The saw, not the drying. Machines run either way.
Extraction and drying start the night it happens, whatever year the house went up.
What waits is the cutting. A material stays in place until somebody knows what it is.
That is why a crew that shows up with a saw and no questions is telling you something.
The ones this era used, and they are predictable.
A pre-war house carries plaster on wood lath rather than board, which behaves differently again.
Plaster stays wet longer than board and gives a meter a strange number.
Six square feet in a room, twenty outdoors.
A flood cut passes that in one wall. The rule turns on paid work, not on the owner’s own afternoon.
If somebody is being paid to stand in that room, the rule applies, us included.
Containment goes up on the assumption and comes down on evidence.
A laboratory. Not a crew, and not this company.
We pick the spot, log the room and the material, and ship the jar.
The percentage on the sheet belongs to whoever read it.
A material nobody sampled has no percentage, and the folder calls it untested.
It skips the presumption. It does not skip the meter.
A 2007 wall still wicks, still hides a wet cavity, still reads dry on the paint.
What changes is that a saw can move on the first afternoon rather than the third.
Which is worth a great deal when the material is already growing something.
Nothing, in a 1941 house or a 2007 one.
Drying starts at $61 an hour once the crew begins.
Mold work starts at $90 an hour, and the count comes off the meters.
Reading the walls before any of that costs nothing and commits you to nothing.
Age asks more questions than this one, all of them in the guides.
On post-1980 stock the presumption falls away, so you do not need one.
Dublin’s median house is 2007. Nobody should be paying a laboratory to confirm what the build year already says.
A folder with a laboratory page in it beats a blank somebody filled in from memory. (341) 220-0032.
Sewage, storm damage, mold, fire and smoke, water, and the reconstruction that follows them, for Oakland and the twenty-four East Bay cities around it. Any hour, any day. Se habla español.